Installation | Installation is quick and easy. The punch will arrive crated, with only a few parts to attach after uncrating. Here are the details: | Uncrate: | Use a power screwdriver to remove crate top and sides | Lift machine off skid: | A forklift is handy, but we use a manual 1k forklift. (Gross weight, about 400 lbs; 4 able men can lift it off the skid.) | Attach operator's handle: | Attach with two bolts. | (If ordered with air) Connect air supply: | Attach your supply hose to the 1/4" NPT quick disconnect (included.) Machines exported are fitted with a metric air connector. | That’s all! | The EZ Box Punch is ready! |
| 
Side view - manual handle, crank mechanism, spring/damper |